↓

Tony working on new piece

Tony Lattimer developing surface on new piece

Tony and Pete Swanson pleased with result

Kiln pack before firing in Tony Lattimer's reducing kiln fired with gas to 1300 C

Tony making a new plaster mould.
The new plaster studio is in our back yard.

Shepherd
This piece installed on a private terrace

Installing Shepherd in its new home.

Miro's Nymphs.
Installing the work in front of the Xedra, Rococo Garden, Painswick Spring 2019

Tony and Rachel considering-position-of-blocks

Loading the trailer on a bouncy bed of tree prunings!ings
The trailer was pulled through a narrow winding precipitous path by a tractor.

Five pieces to go in the kiln.
The markings are black slip.

Kiln Opening
New pieces just unpacked from the kiln. July 2018

Tony contemplating the new pieces fresh from the kiln.

Unwrapping pieces to dry before firing.

4 pieces on their way to the kiln. April 2016

Nov 2015
Making a mould from a large piece. November 2015

2014 Yasuo Terada visit
Yasuo talking with Phil Boothe and Tony

Three graces
On trolleys so that they could be moved around the space and the spaces between them could be altered.

Tony with Joking with Miro
Both standing in the kiln prior to blocking up the door and starting the firing.

Dancing the Clay 2007
Unpacking at Plymouth Museum and Art Gallery

Dancing the Clay 2007
Art waiting to be let out at Plymouth Museum and Art Gallery

Dancing the Clay 2007
Judith Robinson and Robin Tatum with Tony Lattimer

Dancing the Clay 2007
The people who put the exhibition on - Plymouth Museum and Art Gallery
↑